2nd Edition (2024): Procedures (replaces Operations Manual)
This section provides a peek at the entire Custom Cabinet Planner (Notion template), as well as the video tutorial on how you might use the Procedures portion of the app.
Responsible | Bobbo Buckley |
---|---|
Last Update | 01/06/2024 |
Completion Time | 2 hours 1 minute |
Members | 11 |
Share This Course
Share Link
Share on Social Media
Share by Email
Please login to share this 2nd Edition (2024): Procedures (replaces Operations Manual) by email.
Custom Cabinet Planner-Procedures (8 of 8)
This Procedures portion of this course will be a multipart instructional tutorial walking you through each of the Categories of the Sequence of Events that take place to Sell, Estimate, Field Measure, Design, Double Check Field Measurements, Engineer, Machine, Finish, Assemble, Hardware, Deliver and Install Custom Cabinetry. The primary objectives being to provide a template for step-by-step instructions on each process along with contextual data being available at the precise time it is needed, appropriate prompts to do things needed to push the project through your system, and a feedback loop that makes sure everything is happening when it needs to be happening.
Chapters:
00:11 - Intro
00:31 - Delivery Procedures
03:00 - Installation Procedures
08:47 - Punch List-Call Backs
10:59 - Outro
This Procedures portion of this course will be a multipart instructional tutorial walking you through each of the Categories of the Sequence of Events that take place to Sell, Estimate, Field Measure, Design, Double Check Field Measurements, Engineer, Machine, Finish, Assemble, Hardware, Deliver and Install Custom Cabinetry. The primary objectives being to provide a template for step-by-step instructions on each process along with contextual data being available at the precise time it is needed, appropriate prompts to do things needed to push the project through your system, and a feedback loop that makes sure everything is happening when it needs to be happening.
Chapters:
00:11 - Intro
00:31 - Delivery Procedures
03:00 - Installation Procedures
08:47 - Punch List-Call Backs
10:59 - Outro
This course serves as an introduction or overview of the Procedures process in Custom Cabinet Planner.
Chapters:
00:11 - Intro
00:33 - Procedures
02:28 - Stages of Business Development
03:25 - Framework
03:47 - Setup-Processes-Maintenance
04:01 - Categories
04:44 - Ballpark Estimate
05:10 - Selections
05:24 - Estimate
06:00 - Field Measure
06:05 - Design
06:23 - Double Check Field Measurements
06:29 - Proposal
06:40 - Engineering
06:54 - Material Acquisition
07:08 - Receiving Inventory
07:25 - Machine Procedures
07:36 - Finishing
08:01 - Assembly
08:16 - Hardware
08:42 - Delivery
08:56 - Installation
09:04 - Outro
This Procedures portion of this course will be a multipart instructional tutorial walking you through each of the Categories of the Sequence of Events that take place to Sell, Estimate, Field Measure, Design, Double Check Field Measurements, Engineer, Machine, Finish, Assemble, Hardware, Deliver and Install Custom Cabinetry. The primary objectives being to provide a template for step-by-step instructions on each process along with contextual data being available at the precise time it is needed, appropriate prompts to do things needed to push the project through your system, and a feedback loop that makes sure everything is happening when it needs to be happening.
Chapters:
00:00 - Intro
00:41 - Overview
01:19 - Procedures Page
01:57 - Views
02:24 - Archiving a Project
03:22 - Template Button
06:15 - Overview of Procedures Page Fields
06:32 - NEW Project Data Page
07:01 - Link to Punchlist and Call Backs
07:07 - Date Field
07:13 - Assignee Field
07:31 - Job/Project Notes
07:39 - Procedure Naming Scheme
09:15 - Hidden Properties/Fields
10:01 - Table of Contents
11:03 - Outro